bmxdad
Well-known member
Concrete poured two days ago ... so how long should I wait before adding a densifier or sealer?
Can I do it in sections? Can I do one side, then move my stuff to the side sealed and do the other side?
Can I do it in sections? Can I do one side, then move my stuff to the side sealed and do the other side?
