Well-known member
Did my own home 15 years ago and am planning another. Thinking about scheduling and can't remember some details. I am thinking I need a power pole right after the foundation is in. Is that right or do the foundation crews need it?
Then for when it goes away I am thinking once the main panel is in place and one or two circuits installed the meter can go in and the power pole goes away.
Is that right?
When I had a house moved to a lot much longer ago I ran a cord to a near neighbor for power but had trouble a time or two with a tripped breaker. I was doing most of the work myself so I worked around it but with hiring subs down time will be a big deal and I am going to need my own power.
I am thinking of having an electrician install the main panel and possibly the run to the detached garage with subpanel. Then do the other myself. If I only need a temp pole until I take over that should work out well.
Then for when it goes away I am thinking once the main panel is in place and one or two circuits installed the meter can go in and the power pole goes away.
Is that right?
When I had a house moved to a lot much longer ago I ran a cord to a near neighbor for power but had trouble a time or two with a tripped breaker. I was doing most of the work myself so I worked around it but with hiring subs down time will be a big deal and I am going to need my own power.
I am thinking of having an electrician install the main panel and possibly the run to the detached garage with subpanel. Then do the other myself. If I only need a temp pole until I take over that should work out well.