wacka.thumb
New member
I have an attached 2 car garage that i want to use as a 3 season workshop. It has a real electricity shortage, though. I want to add at least 2 110/20A circuits and maybe a 220 circuit for heat. The main panel (200A - ex electric heat) for the house is on the other side of a studwall and has lots of capacity and empty slots.
Do I need/should I have a subpanel for the garage, or just run everything from the main panel and through the wall?
Any advice or things to watch for appreciated.
Thanks,
Chris
Do I need/should I have a subpanel for the garage, or just run everything from the main panel and through the wall?
Any advice or things to watch for appreciated.
Thanks,
Chris