Jawgarage
Well-known member
Today we finish the block foundation and temps will be in the 40's - 50's for a couple of days before dipping into the low 30's this weekend and perhaps colder. I will have my foundation inspection tomorrow or Thursday.
So assuming all passes, I have a few questions:
1. When can I backfill and start prepping for the slab work after the inspection ?
2. The ground here is all sand sand sand. I assume that is fine to use as the backfill up to the height of where the gravel will start under the slab.
3. How long to wait for the slab to be poured?
4. You will see in the pictures that one 10' long portion of the block wall is 2 1/2 courses above grade due to slope of ground. Anything special needed to be done on the outside of this wall before the inside backfilling and slab work begins to make sure it does not get damaged? When finished the slab height inside will be almost 1 course above the outside ground line in that area. Should we simply berm that portion higher on the outside of the wall for support?
Thanks everyone.
Jeff
So assuming all passes, I have a few questions:
1. When can I backfill and start prepping for the slab work after the inspection ?
2. The ground here is all sand sand sand. I assume that is fine to use as the backfill up to the height of where the gravel will start under the slab.
3. How long to wait for the slab to be poured?
4. You will see in the pictures that one 10' long portion of the block wall is 2 1/2 courses above grade due to slope of ground. Anything special needed to be done on the outside of this wall before the inside backfilling and slab work begins to make sure it does not get damaged? When finished the slab height inside will be almost 1 course above the outside ground line in that area. Should we simply berm that portion higher on the outside of the wall for support?
Thanks everyone.
Jeff
Attachments
Last edited: