I am getting ready to build a 24x40 pole barn and wondering if there is any issue with pouring the floor after the posts are set and before any walls are built?
Every video I see or every time I have seen someone build a pole barn the do the floor after the building is complete. I was thinking it might be easier to do it earlier in the process.
My idea is to set the posts, plumb them, put the grade boards on and then pour the floor. My thinking is without the walls and headers over the overhead doors it will be so much easier to get the concrete truck close to the pour. Also, seems like floating would be a whole lot easier without the walls and roof on.
I will be doing the concrete work myself with help from friends.
Any thoughts?
Every video I see or every time I have seen someone build a pole barn the do the floor after the building is complete. I was thinking it might be easier to do it earlier in the process.
My idea is to set the posts, plumb them, put the grade boards on and then pour the floor. My thinking is without the walls and headers over the overhead doors it will be so much easier to get the concrete truck close to the pour. Also, seems like floating would be a whole lot easier without the walls and roof on.
I will be doing the concrete work myself with help from friends.
Any thoughts?
Last edited: