I was in a new build last week and I have seen this numerous times thru the years. The stain person was staining the steps AROUND the runner. It cannot be a cost issue. The extra stain would not outweigh the time to tape and trim around the runner. Is there any logical reason for this?
 
To avoid these ads, REGISTER NOW!
OP
D

dclark2171

Well-known member
Joined
Feb 19, 2024
Messages
186
Project manager and/or carpet sub are idiots.

We always scheduled our runners after 2nd coat poly over the stain.
Many years ago I helped my friend with tearing out carpet, cabinets, etc from a 1970's house he purchased. Same thing, we removed the runner and the step paint was added to each side of tack strips with bare wood steps. Weird, Lazy and cheap IMO.
 

duneslider

Well-known member
Joined
Jan 20, 2013
Messages
2,268
Location
Riverton, Utah
I would guess this is more of a production builder and they have a schedule to stick to and they don't want people messing up the hardwood so that is one of the last things finished. They don't have the schedule, or line item, to bring the carpet guy back after wood and don't want to deal with potential damage from the carpet guys.
 

mm08822

Well-known member
Joined
Jan 13, 2012
Messages
6,051
Location
NJ
Things got out sequence. Carpet guy came too early or floor guy too late. But the open house date or closing walk-through date ain't moving.

Bottom line is the customer realizing they got another screwing from the builder several years later when they pull the runner. Builder is long gone, maybe even dissolved the old company!
 
To avoid these ads, REGISTER NOW!

Fixr

Well-known member
Joined
Dec 23, 2012
Messages
9,709
Location
SW VA
Stupid scheduling. Would have been easier and cheaper to stain first (just spread stain all if the way across instead of having to tippytoe around the carpet) and then carpet, but the stain guy was forced to work around the carpet.
 

The Cobbler

Super Moderator
Staff member
Joined
Oct 24, 2013
Messages
25,967
Location
Niagara Region, Ontario, Canada
sounds to me like runner got installed before finishing happened. if they were trying to save material they would finish before the runner was installed and leave the center section unfinished.
 