Guys, I have floor heat in my garage with an on demand boiler type system.
I want to add a stick welder to my shop, 240 volt. Can I split off my floor heat boiler wiring and make that work? I wouldn't need both running at the same time.
I want to add a stick welder to my shop, 240 volt. Can I split off my floor heat boiler wiring and make that work? I wouldn't need both running at the same time.