So here is a question. I plan to wire a subfeed in my garage. 90-100amp. THe plan is to wire it myself, trench a feed etc. It is currently November and the ground will start freezing soon. I do not know if I will get it trenched before then.
The garage currently has some 12-2 romex feeding the garage and lights etc. Over the winter when I have a lot of extra free time, I want to rewire the garage. I see 2 ways to do this-
1. Wire everything in the garage with new panel etc, but leave it all dead, forcing me to leave existing outlets and lights intact as well....( this will happen to some degree anyways,
Or could I use the 12-2 romex feed, to temp wire in my panel and allow my to have it ready , minus the sub feed?
Another question- If I run a single run of conduit down the center of my trusses, can I just use armored 12-2 to branch left and right off to my fluorescent lights?
The garage currently has some 12-2 romex feeding the garage and lights etc. Over the winter when I have a lot of extra free time, I want to rewire the garage. I see 2 ways to do this-
1. Wire everything in the garage with new panel etc, but leave it all dead, forcing me to leave existing outlets and lights intact as well....( this will happen to some degree anyways,
Or could I use the 12-2 romex feed, to temp wire in my panel and allow my to have it ready , minus the sub feed?
Another question- If I run a single run of conduit down the center of my trusses, can I just use armored 12-2 to branch left and right off to my fluorescent lights?