ron in sc
Well-known member
I needed to remove some 1" x 6" treated molding because I decided to put cabinets in that area. The Wolverine flooring was bonded to the molding. I had to use a hammer and chisel to get the Wolverine flooring up where it flowed under the molding. The Wolverine flooring came up in a lot of places with some concrete attached. And those were areas that were not shotblasted or in any way prepped.
