What do you think about just regular reinforcing grids in a garage in lieu of doweling?If you want a really nice garage slab, this is the way to go IMO.
A good well planned grid and soft cuts work well. I used dowel systems in warehouses, where the dowels are spaced 80’ - 100’, with soft cut joints every 20’.What do you think about just regular reinforcing grids in a garage in lieu of doweling?
Reinforcing helps with vertical displacement by keeping the sections/cracks tight. (I have never seen a reinforced slab that had a vertical displacement issue in a driveway/garage application.) I'd also be worried that most contractors placing concrete in a garage or driveway might not actually get the saw cuts and dowels put in the same place.