Hi guys,
I've done a ton of wiring with schedule 40 cpvc and also with flexible conduit but never with the solid conduit.
Just in the planning phase right now and I have a question. If I mount all of my ceiling lights first. Then come back later and run the conduit from light to light, is there enough slop in the fittings to be able to fit the conduit in place without loosening the mounting for the lights? I assume so but figured I'd ask because there is nothing worse then not thinking about these things and finding out you created more work for yourself!
Thanks!
I've done a ton of wiring with schedule 40 cpvc and also with flexible conduit but never with the solid conduit.
Just in the planning phase right now and I have a question. If I mount all of my ceiling lights first. Then come back later and run the conduit from light to light, is there enough slop in the fittings to be able to fit the conduit in place without loosening the mounting for the lights? I assume so but figured I'd ask because there is nothing worse then not thinking about these things and finding out you created more work for yourself!
Thanks!