Hi guys,
So I had a 500 gallon LPG installed the other day for a 22kw Generator and I was going over the startup procedures in the manual and came across a chart that basically said I need a 1" gas pipe. Well they installed a 3/4" pipe. Apparently this isnt going to cut it for how much BTUs to run the full 22kw.
Anyone have experience dealing with a company after they already ran a gas line? The work order said they were putting in a 3/4" but @ 15 feet but based on some changes that needed to be made they installed the tank ~35' away from the generator...
So I had a 500 gallon LPG installed the other day for a 22kw Generator and I was going over the startup procedures in the manual and came across a chart that basically said I need a 1" gas pipe. Well they installed a 3/4" pipe. Apparently this isnt going to cut it for how much BTUs to run the full 22kw.
Anyone have experience dealing with a company after they already ran a gas line? The work order said they were putting in a 3/4" but @ 15 feet but based on some changes that needed to be made they installed the tank ~35' away from the generator...