Got tin on the 2nd wall as well cept for the last sheet ran out of daylight.
seems to be getting a bit more sturdy when I get the walls put on and the tin on it really stiffens things up it dont flex near as much as when I had just got the roof on and it would shake pretty good now with 2 walls braced and on its pretty rock solid.
Got to revamp the Center Pole on the last open side then put in a door and half wall. But will have to pull out the calf pen before I due that so that's gonna be a day long day to get that done. Pull out calf pen and get it closed in enough to keep them inside the pen when i want them there.
Hoping for good weather next Saturday and i can get it done in a day or workable enough.
plus I can stage up boards and stuff this week and have them ready to put on and not have to be finding them in my free to use pile of misc boards. Its not excatly sorted and stacked at all just all tossed on some telephone poles to keep the wood up off the ground.
