franksinatra
Well-known member
YES! Another Subpanel question. More pics
Im trying to flush mount my Subpanel in the attached garage. I have a split foyer so my main floor is at the same height as the subpanel should be. Does anyone have some ideas as to what I might do? Im also wondering if I should try and run the cables from the top of the panel in, as opposed to the bottom up? You can see the dillemma with getting it to the top but I think I can do it if it would be for the best. I would rather not go thru the bottom and have to run the cables up the inside of the box. Not professional looking. It is what it is though. Sometimes you gotta take one for the team
Right now Im thinking Im going to need to build a box up to the ceiling and set the sub panel in it in order to get the semi-clean look. Tell me what you think. Thanks, Grant
Im trying to flush mount my Subpanel in the attached garage. I have a split foyer so my main floor is at the same height as the subpanel should be. Does anyone have some ideas as to what I might do? Im also wondering if I should try and run the cables from the top of the panel in, as opposed to the bottom up? You can see the dillemma with getting it to the top but I think I can do it if it would be for the best. I would rather not go thru the bottom and have to run the cables up the inside of the box. Not professional looking. It is what it is though. Sometimes you gotta take one for the team
Right now Im thinking Im going to need to build a box up to the ceiling and set the sub panel in it in order to get the semi-clean look. Tell me what you think. Thanks, Grant
Last edited:



WTF?

Thank you again for everyones help. Now how do I wire sets of lights? lol