We just had our house built, and 400+- feet behind it I had a 28 x 80 metal building built. I'd like to install a 100 amp service to the metal building from the house.
I had a distribution panel(?) Installed after the transfer switch, on the back on the house, next to meter. (then the house has two sub panels, one to run the house and one to run the garage) and the A/C compressor is wired directly off the distribution panel
Here are my questions.
Can I run 400+- feet of "wake forest" 4/0 4/0 4/0 2/0 from the large lugs in the bottom of the distribution panel, through the 3 inch PVC to some kind of junction box or disconnect(?) (suggestions welcome) mounted on the outside of the metal building?
Should I run MHF from the (junction? Disconnect?) box on the side of the barn to the panel inside the building (and should it be 3/0 copper or stick with 4/0 aluminum)
Suggestions on how to transition from the PVC underground, over the footing and to the side of thr building (since I can not go directly up, from the earth, flush with the side of the metal barn.
Is there a particular type of breaker panel I should or should not use for this project?
Will I need expansion joints below either or both panels (on house and barn)
Should or could i use swedge reducer and go down to 2 inch PVC to enter either or both junction boxes (house and barn)?
I am aware that any pvc above the earth needs to be schedule 80, and I will swap out on the house end. I will relocate where it surfaces at that time as well.
Any other suggestions, information and opinions are welcomed
Thanks in advance!
Shane


We just had our house built, and 400+- feet behind it I had a 28 x 80 metal building built. I'd like to install a 100 amp service to the metal building from the house.
I had a distribution panel(?) Installed after the transfer switch, on the back on the house, next to meter. (then the house has two sub panels, one to run the house and one to run the garage) and the A/C compressor is wired directly off the distribution panel
Here are my questions.
Can I run 400+- feet of "wake forest" 4/0 4/0 4/0 2/0 from the large lugs in the bottom of the distribution panel, through the 3 inch PVC to some kind of junction box or disconnect(?) (suggestions welcome) mounted on the outside of the metal building?
Should I run MHF from the (junction? Disconnect?) box on the side of the barn to the panel inside the building (and should it be 3/0 copper or stick with 4/0 aluminum)
Suggestions on how to transition from the PVC underground, over the footing and to the side of thr building (since I can not go directly up, from the earth, flush with the side of the metal barn.
Is there a particular type of breaker panel I should or should not use for this project?
Will I need expansion joints below either or both panels (on house and barn)
Should or could i use swedge reducer and go down to 2 inch PVC to enter either or both junction boxes (house and barn)?
I am aware that any pvc above the earth needs to be schedule 80, and I will swap out on the house end. I will relocate where it surfaces at that time as well.
Any other suggestions, information and opinions are welcomed
Thanks in advance!
Shane