So the framing is underway and I'm thinking I'd like to get the electrical permit going. I defiantly don't know where every single outlet will be at the moment but would like to at lease get the panel in and maybe a couple outlets that I do know. I spoke to my architect and he told me I'd have to show where every outlet, switch, junction, and light fixture would be along with the MODEL of the lights being using. If i don't know where the outlets will be I DEFIANTLY don't know what fixtures I'll be using.
Is there a minimum amount i can do for now to pass inspection and then add things later as needed? I'll be using MHF for this as recommended here and for ground we have a UFER ground in the footing. Wire run is about 125'.
This is in CA.
thank you
Is there a minimum amount i can do for now to pass inspection and then add things later as needed? I'll be using MHF for this as recommended here and for ground we have a UFER ground in the footing. Wire run is about 125'.
This is in CA.
thank you