Planning a DIY 30x40 garage/shop build this summer. Feel like I have most of it nailed down.
Planned Use: Park vehicles, storage for small tractor w/ blower, 4x4, duck boat in the fall/winter, etc. Plan to turn the back section into a workshop area for light vehicle work/assorted workshop ****, as well as an area to work on the boat, small engines, etc. No lift as of current but planned for possibility of 2 post in the future.
Dimensions: 30x40. 12'8" Ceilings
Build: 2x6 Construction, Engineered Slab w/ 8" stemwalls. Vinyl siding, steel roof.
Electrical: 125A Sub panel, 240V for future lift, welder/compressor, and EV future proof. Circuits will be ran for heatpump. Power is planned to be ran underground, will likely stub up through the slab. Lots of outlets, planning for all the ones along the back wall to be in the 40" range to accommodate work benches. I have all the circuits planned for the most part. Outlets are 20A alternating between 2 circuits, I have a few dedicated circuits for a couple freezers and a fridge, if I go down the plumbing route there will be a dedicated POU Hot water tank circuit, lights, openers, etc will all be on separate circuits.
Lighting: 10x 8FT T8 LED Lights, 100K LM total. Should provide 65-75FC on working plane range. Will add task lighting along the back wall as required.
Doors: Found a killer deal - Planning two 10x10s in the front, one 8x8 on the side. Unsure if wall mounted openers will be in the budget - will decide closer to and wire outlets as needed. Plan is to keep the 8x8 on a manual chain pull as it won't see a ton of use.
I know most people prefer the drive through, but that just isn't feasible with the layout of my land. It will also allow me to park the duck boat perpendicular in the shop area to work on it, and will be very convenient to store in the winter, and still fit two vehicles inside.
Plumbing: Possibly planning on running water for a slop sink in the back right corner. Unsure of the logistics of it. Getting water to it should be fairly simple, but it might be a slight uphill run to the septic tank. If that's the case will likely scrap that plan.
Finish: Not planned past electrical right now. Over the winter/next year plan to blow R40 into the ceiling, R21 into the walls, finish walls with painted OSB, and ceiling with white steel.
I think I've covered anything, just looking for some critique/advice, and know what people would change about theirs/can't live without. You can only build once so may as well do it right.



Planned Use: Park vehicles, storage for small tractor w/ blower, 4x4, duck boat in the fall/winter, etc. Plan to turn the back section into a workshop area for light vehicle work/assorted workshop ****, as well as an area to work on the boat, small engines, etc. No lift as of current but planned for possibility of 2 post in the future.
Dimensions: 30x40. 12'8" Ceilings
Build: 2x6 Construction, Engineered Slab w/ 8" stemwalls. Vinyl siding, steel roof.
Electrical: 125A Sub panel, 240V for future lift, welder/compressor, and EV future proof. Circuits will be ran for heatpump. Power is planned to be ran underground, will likely stub up through the slab. Lots of outlets, planning for all the ones along the back wall to be in the 40" range to accommodate work benches. I have all the circuits planned for the most part. Outlets are 20A alternating between 2 circuits, I have a few dedicated circuits for a couple freezers and a fridge, if I go down the plumbing route there will be a dedicated POU Hot water tank circuit, lights, openers, etc will all be on separate circuits.
Lighting: 10x 8FT T8 LED Lights, 100K LM total. Should provide 65-75FC on working plane range. Will add task lighting along the back wall as required.
Doors: Found a killer deal - Planning two 10x10s in the front, one 8x8 on the side. Unsure if wall mounted openers will be in the budget - will decide closer to and wire outlets as needed. Plan is to keep the 8x8 on a manual chain pull as it won't see a ton of use.
I know most people prefer the drive through, but that just isn't feasible with the layout of my land. It will also allow me to park the duck boat perpendicular in the shop area to work on it, and will be very convenient to store in the winter, and still fit two vehicles inside.
Plumbing: Possibly planning on running water for a slop sink in the back right corner. Unsure of the logistics of it. Getting water to it should be fairly simple, but it might be a slight uphill run to the septic tank. If that's the case will likely scrap that plan.
Finish: Not planned past electrical right now. Over the winter/next year plan to blow R40 into the ceiling, R21 into the walls, finish walls with painted OSB, and ceiling with white steel.
I think I've covered anything, just looking for some critique/advice, and know what people would change about theirs/can't live without. You can only build once so may as well do it right.