sammm
Well-known member
I'm getting ready to pour my garage slab and have dug 2-18" deep trenches. 1 for my electric service and the other for future use (CATV, phone, alarm, etc).
What is the usual method for closing up the hole under the building forms so I can backfill and keep the dirt out of my footings?
What is the usual method for closing up the hole under the building forms so I can backfill and keep the dirt out of my footings?
