I'm getting ready to pour my garage slab and have dug 2-18" deep trenches. 1 for my electric service and the other for future use (CATV, phone, alarm, etc).

What is the usual method for closing up the hole under the building forms so I can backfill and keep the dirt out of my footings?
 
To avoid these ads, REGISTER NOW!

JSBriggs

Well-known member
Joined
May 10, 2009
Messages
1,041
Location
Auburn CA
If it just for wiring, I would stub out some conduit sweeps. If it for plumbing as well, it takes a bit more planning. You will need to sleeve it with somthing. PVC works well 3,4,or 6" depending on what you have planned.

-Jeff
 
To avoid these ads, REGISTER NOW!
OP
S

sammm

Well-known member
Joined
Jun 7, 2010
Messages
609
Location
North Carolina
If it just for wiring, I would stub out some conduit sweeps. If it for plumbing as well, it takes a bit more planning. You will need to sleeve it with somthing. PVC works well 3,4,or 6" depending on what you have planned.

-Jeff

I do have 2 runs of 1.25" PVC laid in the trench and stubbed out. 1 for electrical, 1 for whatever else. No plans for plumbing.
 