I hired out the floor grinding, which to me was some of the best money I ever spent. That's simply not a job I'm detailed oriented enough to do.
After about 4 hours of grinding and vacuuming, they were done, and I started with the epoxy-coat.
Today is polyurea day. (I've taken a few pictures which I'll show when I'm done).
A couple tips....
1. Buy heavy rubber gloves.
2. Check your kit the day before for any leakage. I had some acid etch leak in both containers. I had to first carefully wash both kits before starting.
3. I thought the stuff sets up pretty fast. I would definitely only mix a single batch on your first batch or two until you figure out your strategy.
4. Upgrade to 18" rollers and a wider squeegee by going to your local home improvement store. I used an 18" squeeg and an 18" roller and I felt like that saved a lot of time.
5. Wear heavy rubber gloves.
6. Once flakes are on the ground, they won't blow anywhere. (I have a couple areas where while flaking, I spilled some on the floor (as I pulled my hand out from grabbing some) and once they are down, they are down. Leaf flower won't flow them).
7. I used the antiskid everywhere. The floor looked really slick, and I'm putting a clear over it today, so I'm hoping I'll still have a non-skid surface that isn't too sharp.