The Plan:
View media item 10428View media item 10429View media item 1044040 X 60 with 14 foot wall stick frame - vaulted ceiling with scissor trusses
6" reinforced slab with geothermal heat pump - radiant floor heat
Two 10 x 10 doors and one 12 x 12 door
Lots of windows up high for natural light
12 X 18 office
18 X 28 fab room (dirty bay)
320 amp electrical service with plans for PT-355 Digital Phase Converter
Two 2 post lifts
Plumbing for bathroom and water spigots
Wired for communications from house
Primary use will be street and track car design, fabrication, and tuning
Comments and suggestions welcome
Project begins - June 10, 2011 Day 1
View media item 10430June 16, 2011 - Dug down to solid clay and added pitrun to footing grade
View media item 10431I'm getting a shop so the family gets a new garden and playground
View media item 10432Running water from house to garden
View media item 10433June 26, 2011 Garden almost complete
View media item 10434Shop construction took a 2 week break
July 6, 2011 Garden and Playground
View media item 10435July 8, 2011 Shop construction resumes, drain plumbed to septic system and footing forms in place
View media item 10436July 11, 2011 Footing reinforcement, drain cleanout, conduit for water, com, extra 2" for future use
View media item 10437Pump truck
View media item 10438First pour
View media item 10439
View media item 10428View media item 10429View media item 1044040 X 60 with 14 foot wall stick frame - vaulted ceiling with scissor trusses
6" reinforced slab with geothermal heat pump - radiant floor heat
Two 10 x 10 doors and one 12 x 12 door
Lots of windows up high for natural light
12 X 18 office
18 X 28 fab room (dirty bay)
320 amp electrical service with plans for PT-355 Digital Phase Converter
Two 2 post lifts
Plumbing for bathroom and water spigots
Wired for communications from house
Primary use will be street and track car design, fabrication, and tuning
Comments and suggestions welcome
Project begins - June 10, 2011 Day 1
View media item 10430June 16, 2011 - Dug down to solid clay and added pitrun to footing grade
View media item 10431I'm getting a shop so the family gets a new garden and playground
View media item 10432Running water from house to garden
View media item 10433June 26, 2011 Garden almost complete
View media item 10434Shop construction took a 2 week break
July 6, 2011 Garden and Playground
View media item 10435July 8, 2011 Shop construction resumes, drain plumbed to septic system and footing forms in place
View media item 10436July 11, 2011 Footing reinforcement, drain cleanout, conduit for water, com, extra 2" for future use
View media item 10437Pump truck
View media item 10438First pour
View media item 10439