today was a pretty good day,this morning i started off with pulling the motor off and installing the spacers that were in between the old one and the head,something i forgot to do,then realized after i saw how much slack there was in the belt.heres where i felt good about making the studs that i mounted it on because i knew i had more than enough length for the spacer and the rubber bushings i made.
once put back together,everything lined up nicely.i ran my new cord,wich is 12/2 service cord up to the switch and out to the motor.it took about an hour to get the switch back together because of what i had to do to get the button out.so after putting it back together,making a rivet,re tapping the plate,not having the right screws,using longer screw's and making studs,it's back together and installed.
tonight i'm going to start making a bracket that hangs off the rear motor stud's,that the variable speed controller will mount to.luckily a friend stopped by and we think we have the wiring figured out,and i also have another guy comin by on thursday night who will know for sure.if all goes right,i'll be makin chips thursday night.