Magneto
Well-known member
SHAZAAM! Looking Good.
bad *** - very good work for a guy with "limited handyman" skills or however you put it in the first post!
SWEET! Damn that looks GREAT. When's the Man Cave Party?
Nice Billiard Light - Rack em up! Are those little halogens?
If you already used 5/8 drywall for the ceiling, I recommend Behr Interior Texture Paint (ceiling popcorn finish) available at HD. DON'T use the Homax brand from Blowes. I tried Textured Smooth, but it turned into an essentially coat of primer. A really expensive one. My wife is saying you don't have to prime, but it doesn't hurt.Hey Saba,
What did you use to put the texture on the ceiling? I'm at my wits end taping & mudding my ceiling. Don't think I'm going to get the smooth result I was hoping. Not willing to put the time & effort to do so. Would like to go with some type of texture to hide the imperfections. What do you suggest.
Bigdaddyhambones2011what is the ebay sellers name. I want to see his goods
If you already used 5/8 drywall for the ceiling, I recommend Behr Interior Texture Paint (ceiling popcorn finish) available at HD. DON'T use the Homax brand from Blowes. I tried Textured Smooth, but it turned into an essentially coat of primer. A really expensive one. My wife is saying you don't have to prime, but it doesn't hurt.
Couple of pointers:
- buy a paint mixing drill bit
- use half inch nappy (semi smooth). Buy a bunch of refills. They get ****** quick
- not kidding: wear a puncho and cover your beautiful floors
- even though it doesn't say to use water, you should use about 20 oz per 2gal bucket. Worked much better
- I used up 3two gallon buckets for 24x24
Bigdaddyhambones2011
![]()
![]()
![]()
Still need to drywall and finish the downstairs.
And I still need sign off from the town on occupancy.
Thanks everyone for the ideas.
WOW! BEAUTIFUL!!!! You did a great job. You're really going to love that space.
Great first project, interested to see the garage fit out
Nice build. Look like you will be enjoying that space this winter. Good work on keeping up with the schedule. I feel like most builds get lost as things don't get done in a timely manner and they become the never ending unfinshed project. Nice work.
X...
Snow is here, but we're on schedule. See update below. I think a bit of a healthy competition with you, brother, helped a bit.Looking good! I know what you mean about the 16" centers being off. I had to sister in a couple new studs when I finished my walls. You're almost there.... the snow is ready to fly, hurry up.