Homewrecker
Well-known member
While I wait for our new house to be finished I'm trying to come up with ideas of a color scheme for the garage (I'm leaning towards blue and grey).
The foundation walls in the garage come up 3' above the slab. I was thinking of coating those in a different color epoxy than the floor and perhaps even having a border of the foundation wall color extend a few inches onto the floor (i.e. wall will be blue with a blue 6" border around the floor)
Is there a time limit to when one coat of epoxy can be painted over another? For instance, since winter is coming I was thinking of doing the foundation walls and a floor border over the winter and the remaining portion of the floor when it gets warmer again (garage will be heated but I'm not comfortable doing the entire floor when it's freezing outside - especially the area at the garage door).
If I'm doing the 2 color scheme do I have to apply these colors within hours or days of each other or does it matter? Once everything is done I will then do a urethane clear coat on top of everything.
Also, it is said you're not supposed to keep the mixed epoxy in the bucket and that it should be poured out on the floor immediately. Since I'm doing the foundation walls how would I do this? Do I just use a tray and paint roller?
The foundation walls in the garage come up 3' above the slab. I was thinking of coating those in a different color epoxy than the floor and perhaps even having a border of the foundation wall color extend a few inches onto the floor (i.e. wall will be blue with a blue 6" border around the floor)
Is there a time limit to when one coat of epoxy can be painted over another? For instance, since winter is coming I was thinking of doing the foundation walls and a floor border over the winter and the remaining portion of the floor when it gets warmer again (garage will be heated but I'm not comfortable doing the entire floor when it's freezing outside - especially the area at the garage door).
If I'm doing the 2 color scheme do I have to apply these colors within hours or days of each other or does it matter? Once everything is done I will then do a urethane clear coat on top of everything.
Also, it is said you're not supposed to keep the mixed epoxy in the bucket and that it should be poured out on the floor immediately. Since I'm doing the foundation walls how would I do this? Do I just use a tray and paint roller?
