So it's been a while since the last post, mainly because I have been going straight home and working until 10pm every night. That being said, it's getting CLOSE!
Soffit installed:
Main panel wired:
Main Disco wired:
Black steel pipe for air lines in:
Dug electric service line for supply from garage to house:
Insulation in the shop (paid to have this done - along with drywall):
Drywall in:
Stucco done - also hired out:
This weekend is getting the main service ready (320 amp can, weatherhead, etc), along with getting the ceiling painted. If time permits, priming the outside as well. Then hang the lights, and start building shelving in prep to move in!
Soffit installed:
Main panel wired:
Main Disco wired:
Black steel pipe for air lines in:
Dug electric service line for supply from garage to house:
Insulation in the shop (paid to have this done - along with drywall):
Drywall in:
Stucco done - also hired out:
This weekend is getting the main service ready (320 amp can, weatherhead, etc), along with getting the ceiling painted. If time permits, priming the outside as well. Then hang the lights, and start building shelving in prep to move in!
)