Hi guys, I have a few questions and instead of cluttering up anyone else thread, I decided to start this one. We just moved in the house and it came with a shop out back, details below.
The building is a standard 30x30 metal building on concrete slab with a 60a feed coming from the house panel to a 12-16 sub panel in the shop. There are only 3 wires in the feeder and the sub panel is NOT grounded, nor does it have a ground bar in it for ground wires to connect. There is no ground rod outside the shop either. Also, none of the outlets or switches are grounded, what do I need to do at this point?
It was suggested by another member that I change out the 12-16 box first. I have an 8-16 sub panel that I used as a sub panel at my other shop, would that be a good choice here or should I look for a different kind of breaker panel?
I may want to eventually have the electric company run a meter pan to the shop so I can have more than 60a but I doubt it will be this year, possibly next year. Should I go with a 200a panel as a sub panel for now, since I may decide to go with full 200a service in the future?
I have a couple more questions but want to hash these out first before I go any farther. TIA
The building is a standard 30x30 metal building on concrete slab with a 60a feed coming from the house panel to a 12-16 sub panel in the shop. There are only 3 wires in the feeder and the sub panel is NOT grounded, nor does it have a ground bar in it for ground wires to connect. There is no ground rod outside the shop either. Also, none of the outlets or switches are grounded, what do I need to do at this point?
It was suggested by another member that I change out the 12-16 box first. I have an 8-16 sub panel that I used as a sub panel at my other shop, would that be a good choice here or should I look for a different kind of breaker panel?
I may want to eventually have the electric company run a meter pan to the shop so I can have more than 60a but I doubt it will be this year, possibly next year. Should I go with a 200a panel as a sub panel for now, since I may decide to go with full 200a service in the future?
I have a couple more questions but want to hash these out first before I go any farther. TIA