I'm adding a 125a sub panel off of a 200a main panel that is ~100' away. Most of the run is under my house, and the rest (~15') is in 2" conduit underground. Under the house I was going to tie the wires into the rest of the electrical wires that run under the house. I was planning on using #2 copper for the 2 hots and the common, but I'm unsure about what size ground, or if I even need to run a ground. I have a Ufer ground (20' rebar in the slab) at the subpanel location.
Can anyone let me know what size ground I need, or if I even need to run one?
Is it typical to use single #2 wires, or a bundled set?
Can anyone let me know what size ground I need, or if I even need to run one?
Is it typical to use single #2 wires, or a bundled set?