I would like to run a circuit from the Blue breaker in my subpanel, down conduit into a box. The 12/2 will first hit the duplex GFI outlet for convenience in that locale, then to a switch (to control additional overhead shop lights yet to be installed), then travel back up through the subpanel, and up and out EMT to the shop lights overhead.
Is this code, and am i completely kosher this way?
Or do i need to run one EMT down to box with outlet and switch, and another EMT out of box, external to subpanel, and up to lights ?
Thanks guys . Below is an MS paint idea of what i want to do..