Crazy68Dart
Well-known member
Hi all, finishing up my garage, would like to fill the saw joints in the concrete. The floor has been in for 12 months (under cover, etc.). Just got the insulation, drywall, and paint finished over the past month. Cleaning the floor up after all the mess and thought it might be nice to fill the saw joints so they don't fill back up with ****.
I am not finishing the floor in any special way. It is 6" floor with radiant PEX with a sealer applied.
Thanks.
I am not finishing the floor in any special way. It is 6" floor with radiant PEX with a sealer applied.
Thanks.
