vekster
Well-known member
love it
looks great
looks great
My building before concrete with options listed previously was 16k. Lumber has been skyrocketing this past month so it may vary.What is there ballpark pricing?
My building before concrete with options listed previously was 16k. Lumber has been skyrocketing this past month so it may vary.
Sent from my SM-G950U using Tapatalk
No worries! It's hard to dig through an entire thread sometimes. I don't mind helping.Very nice. I'm sorry for making you repeat yourself, I missed the post earlier about pricing.
I'm looking to use Morton for my near-future build.
If it makes you feel any better Jersey..... We put in a 17K Rotary (not sure if it's symmetrical or not). We've got 2 F 550 diesels one is a flatbed that it lifts no problem and balances fairly well. The other is a service truck with a 8,000 lb rated crane on one side. Now that truck is super sketchy, from lining up the legs right to actually getting it up in the air. We got 4 extendable posts that we put up tight at 4 corners to help ease the mind!
100%How was your experience with Shirk? Considering them for a pole barn here in NJ