I am installing 3” crown molding over my kitchen cabinets. The gap b/w the top of the cabinets and the ceiling is 6” so i’m going to cover that with a filler panel.
I watched some videos and I think I need to nail on some strips of scrap wood to the back of the cabinet faces to provide a nailer for the filler strip. (red lines) Then run some 1" x 3” strips on the ceiling to provide a nailer for the crown molding. (green lines).
Is this the correct way to do it? Any tips?
Thanks