I'm in the process of planning for a 12'x14' shed.
It will need one 15A circuit to supply overhead lighting and an outdoor light.
There is a detached garage about 30' away from the planned shed site with a subpanel from the house which is about 30' from both. (triangle of buildings)
The question is.... can I get away with running one circuit from the detached garage to the shed? Or will a subpanel in the shed from the house be required? Or maybe something else? what's normal?
I'm in High Point NC, and I know everywhere is different; just looking for the rule-of-thumb.
Thanks,
It will need one 15A circuit to supply overhead lighting and an outdoor light.
There is a detached garage about 30' away from the planned shed site with a subpanel from the house which is about 30' from both. (triangle of buildings)
The question is.... can I get away with running one circuit from the detached garage to the shed? Or will a subpanel in the shed from the house be required? Or maybe something else? what's normal?
I'm in High Point NC, and I know everywhere is different; just looking for the rule-of-thumb.
Thanks,