wingrider02
Well-known member
Hello All!
I have finally got cement in my shed, so once I can get back in it to work, I figure I will start by putting the ceiling in.
My questions will surround the stringers between the trusses. I plan to use 2x4’s on edge at 2’ centers. What is the best way for me to attach these? If I line them all up, I could sink nails in one end, but then have to toe nail the other.
My thoughts would be to either stagger every other truss, so they would not be in a straight line, but be off by 1 1/2” to get nails in every end, or get hangers and strap one side of every stringer.
Are there other ways to do this that I am not thinking of? Would toe nailing them in straight be as strong?
Thanks for any help!
I have finally got cement in my shed, so once I can get back in it to work, I figure I will start by putting the ceiling in.
My questions will surround the stringers between the trusses. I plan to use 2x4’s on edge at 2’ centers. What is the best way for me to attach these? If I line them all up, I could sink nails in one end, but then have to toe nail the other.
My thoughts would be to either stagger every other truss, so they would not be in a straight line, but be off by 1 1/2” to get nails in every end, or get hangers and strap one side of every stringer.
Are there other ways to do this that I am not thinking of? Would toe nailing them in straight be as strong?
Thanks for any help!