maplepuck
Active member
I am wanting to add a few additional outlets 120s and 240s, and one for a welder in my garage...
I went to determine my service amperage...and noticed no main shut off. (and no more room) so a new load center is in the future methinks.
the other side of the wall, just the meter.
I'm obviously going to have to pull a permit and have the PoCo perform a proper shut off for me to upgrade...
Question: despite my meager knowledge and ability; i would normally be apt to change the box on my own, but given the facts; should I hire a pro? and what can i expect in pitfalls? e.g. additional costs, actions, etc.
thanks for looking
D
I went to determine my service amperage...and noticed no main shut off. (and no more room) so a new load center is in the future methinks.
the other side of the wall, just the meter.
I'm obviously going to have to pull a permit and have the PoCo perform a proper shut off for me to upgrade...
Question: despite my meager knowledge and ability; i would normally be apt to change the box on my own, but given the facts; should I hire a pro? and what can i expect in pitfalls? e.g. additional costs, actions, etc.
thanks for looking