traumadoc2b
Well-known member
So, we're building a house and I just finished my meter can/service entrance and passed inspection. Waiting for the POCO to drop the transformer and hook-up.
Next step is running a feeder from the 200A disconnect out to the barn. At some point, I hope to build a bigger workshop several feet away. I plan to install a 200A panel in the barn with subfeed lugs to supply the future workshop. The area between will essentially be a gravel drive. Given the gravel, traffic, and ability to pull wire later, I plan to install conduit between the current barn and future workshop location.
I don't see anywhere that says I can't put UF or USE in conduit. The diameter listed for the manufacturer has the twisted cable at 1.5" diameter. I figure 2-1/2" SCH 80 under areas where there will be some driveway traffic should be OK.
The run from the service entrance to the barn is about 200'.
Thoughts, suggestions?
Next step is running a feeder from the 200A disconnect out to the barn. At some point, I hope to build a bigger workshop several feet away. I plan to install a 200A panel in the barn with subfeed lugs to supply the future workshop. The area between will essentially be a gravel drive. Given the gravel, traffic, and ability to pull wire later, I plan to install conduit between the current barn and future workshop location.
I don't see anywhere that says I can't put UF or USE in conduit. The diameter listed for the manufacturer has the twisted cable at 1.5" diameter. I figure 2-1/2" SCH 80 under areas where there will be some driveway traffic should be OK.
The run from the service entrance to the barn is about 200'.
Thoughts, suggestions?