matthimself456
Active member
I have a project starting soon that is going to require my main panel to be moved and a new electrical service installed. At the same time I would like to take the opportunity to setup an automatic transfer switch and replace the power feed to my detached shop building. My understanding of electrical is mostly internet-fueled but I'd say its better than the average homeowner. That said, I have zero experience with service-level stuff and really don't know all the lingo that goes along with that. I'm pretty comfortable with NM and THHN and general household stuff but I'm certainly no pro.
Right now I have a 200A service coming overhead into a meter on the front of my attached garage. There is a service disconnect inside the garage and a cable then runs above the garage ceiling to my main C-H 200A panel on the back wall. From there branch circuits go out to the rest of the house and some way-too-small cable runs underground about 130ft across my backyard to a 60A sub panel in the detached shop. I also have a 10kW backup generator that has never been installed.
The new service will run underground into the attached garage. The main panel will still be in the garage but to simplify the panel move I will probably end up with another sub panel in the basement. I'd like to upgrade to 100A panel in the detached shop and the easiest route to get there from the attached garage is through the basement, out the rim joist, underground for approximately 20 feet, and then up and into the shop. The 10kW gen should be plenty for backup. I have no need or expectation of being able to run air conditioning, electric stove, or shop equipment during a power outage. Its there primarily for sump pumps, furnace fans, fridge, freezer, and some lights. That said the simplest approach seems to be to put a 200A automatic transfer switch on the incoming service rather than the individual branch circuit-type and just manage load manually during an outage. Does that seem reasonable? Also is there some kind of residential equivalent to the switchgear commonly seen upstream of any breaker panels in industrial settings? Like have the service come into 3 large breakers which each feed a single panel instead of the normal residential main-panel / sub-panels setup? Not sure that would actually be of any advantage to me, just curious.
Also, how should the run to the detached shop go? I think SER(?) is what should be used through the basement and then transition to something else for the underground portion depending on direct bury or in conduit?
FYI, I will not be doing most of this work personally. I just like to understand options before hearing from the contractor so I can speak somewhat intelligently and know what the pros and cons are of any approach suggested to me by the contractor.
Right now I have a 200A service coming overhead into a meter on the front of my attached garage. There is a service disconnect inside the garage and a cable then runs above the garage ceiling to my main C-H 200A panel on the back wall. From there branch circuits go out to the rest of the house and some way-too-small cable runs underground about 130ft across my backyard to a 60A sub panel in the detached shop. I also have a 10kW backup generator that has never been installed.
The new service will run underground into the attached garage. The main panel will still be in the garage but to simplify the panel move I will probably end up with another sub panel in the basement. I'd like to upgrade to 100A panel in the detached shop and the easiest route to get there from the attached garage is through the basement, out the rim joist, underground for approximately 20 feet, and then up and into the shop. The 10kW gen should be plenty for backup. I have no need or expectation of being able to run air conditioning, electric stove, or shop equipment during a power outage. Its there primarily for sump pumps, furnace fans, fridge, freezer, and some lights. That said the simplest approach seems to be to put a 200A automatic transfer switch on the incoming service rather than the individual branch circuit-type and just manage load manually during an outage. Does that seem reasonable? Also is there some kind of residential equivalent to the switchgear commonly seen upstream of any breaker panels in industrial settings? Like have the service come into 3 large breakers which each feed a single panel instead of the normal residential main-panel / sub-panels setup? Not sure that would actually be of any advantage to me, just curious.
Also, how should the run to the detached shop go? I think SER(?) is what should be used through the basement and then transition to something else for the underground portion depending on direct bury or in conduit?
FYI, I will not be doing most of this work personally. I just like to understand options before hearing from the contractor so I can speak somewhat intelligently and know what the pros and cons are of any approach suggested to me by the contractor.