bad_idea
Well-known member
So... I am in process of installing a 100 amp sub panel in my detached garage (breakered at 90 amps). I am using 2-2-2-4 MHF from the house to the garage. I am direct burying the MHF because my soil is sand and clay, no rocks within MILES. Inspector said I have to have schedule 80 conduit from the soil to the building. Lowe's only carries schedule 40, WTF?! Where can I find 1 1/2" schedule 80 PVC conduit? I swear this should be simple.