I'm probably overthinking this, but.........
I'm planning a 52x40 pole structure. Two 14' highbays on the left end and two 12' bays with loft on the right end. Due to the local power companies requirements and location of the transformer, the meter must be near the front left of the structure. I'm trying to include image, but not sure if I got it.
Unfortunately, most of my large electrical loads (welders, compressor, etc.) are on the other end of the building. Both bays will have typical light and receptacle circuits.
Would it make sense to run 4/0 to the other side and install a subpanel? I don't actually think it will save me any money when I'm all done, but It would be cleaner.
I'm planning a 52x40 pole structure. Two 14' highbays on the left end and two 12' bays with loft on the right end. Due to the local power companies requirements and location of the transformer, the meter must be near the front left of the structure. I'm trying to include image, but not sure if I got it.
Unfortunately, most of my large electrical loads (welders, compressor, etc.) are on the other end of the building. Both bays will have typical light and receptacle circuits.
Would it make sense to run 4/0 to the other side and install a subpanel? I don't actually think it will save me any money when I'm all done, but It would be cleaner.