My dad is having a new house built and so far I am confused by what is going on. I know nothing about house construction yet I do know some rules of thumb about being a handy man.
This house is slab construction.
The concrete was poured yesterday in footers dug 15" to 16" deep. Last night temps got down to 30 degrees F.
Today they are putting the blocks on the footers.
I thought the min was 7 days before concrete should be built on and 28 days for full cure. Even if they used cold weather additives or other chemicals, can they set blocks 24 hours later?
What about frost line? We are over 50" frost line for this part of Indiana ( Johnson County).
The blocks are 8" tall. If they back fill all the way to the top of 2nd block they will only have 32" of dirt from the surface to under the footer. I thought foundation footers should be 12" below frost line?
Thanks!!
Sent from my SM-G965U using Tapatalk
This house is slab construction.
The concrete was poured yesterday in footers dug 15" to 16" deep. Last night temps got down to 30 degrees F.
Today they are putting the blocks on the footers.
I thought the min was 7 days before concrete should be built on and 28 days for full cure. Even if they used cold weather additives or other chemicals, can they set blocks 24 hours later?
What about frost line? We are over 50" frost line for this part of Indiana ( Johnson County).
The blocks are 8" tall. If they back fill all the way to the top of 2nd block they will only have 32" of dirt from the surface to under the footer. I thought foundation footers should be 12" below frost line?
Thanks!!