My service pops out and this is a segmented thought, its easy to use multiple posts, I might have written it, didn't hit the send or from another device,,, so,,,,
Big things I learned is when I plan I got wayyyyyyyyyy too much. More than I need when the dust settles and its worth making some changes, its worth doing some jobs, details twice, you can try for perfect but oft just as easy to tailor it when done. A couple well planned tailorable hydrants beats a dozen everywhere .
I was the king of starting complicated,,, I can relate to the garage journal cause I done some of these jobs a lot, some several, some once but ones interest me is the lot. It has become second nature for me to install or mod a hydrant when its needed or practical, some I put up with long enough but its a place where the rubber hits the road and I needed to add 20 ft after all that planning to get it to work right.
So,,, whats it got to do with it,, get the mains in the right spot, leave some means and when I wired as needed and as I went I used 1/2 the material and 1/2 the work to get it tailor made. I have some remnants I still could remove from changes, at first I needed a box with 4 outlets cause I had **** plugged in from everwhere but as I tailored and added most of that went away and the service outlets are empty and have a dozen but use a couple one at a time and the need for double circuits everywhere is highly exaggerated. I got another I could get on adjacent or could be added any time or can even be solved by cords on occasion, all that **** and even multi wire in common residential is ok, its ok with a lot of people but for the diy its just more stuff.
Sometimes I aint messisng with it, been there done it and on occasion asimply run another wire or even a pipe so it aint gotta all be in one and there is nothing better,,,, more better than a pipe single circuit to an outlet or equipment.
I got 3 6/50 mounted in a deep 2x4 box and 1/2 pipe the horror of it all. Scrap of pipe, 2 connectors, small box with recept screwed in, few ft of 10 wire.
Fundamentally don't have any pipe bigger than 3/4 and use 4 inch boxes and if I am putting devices like gfci or welder in I have some deep, 2 inch I think.