Green Hell Mustang
Member
I love the storage solutions. I need something like this for my garage...and other parts of the house.











Thanks. those are very rare cool items. i got them from a collector-friend.shame that came damaged but your Datsun jacket is super cool
Hi Rudi, yeah you can buy the OS TC24B1Z engines now as a complete, built motor. If you buy it, you have a variety of options and bolt-ons to purchase or not. I'd love to have one, but honestly i think it's impossible to get it street legal in my car without investing a serious amount of money. Switzerland is really complicated when it comes to engine modifications registering. Also the Engine itself is not exactly cheap, but an absolute engineering marvel!Poster looks great! Are you planning on getting A OS-GIKEN twin cam head?
I read they are doing a new run of them. But you have to buy a entire engine from them. rated to 400hp and rev to 10-12k RPM. only cost 62,000 Euro! ha!
Rudi.






































Fast perfekt, vielen DankHerzlichen Glückwünwch und einen guten Rutsch ins Neujahr, wenn mein sehr verröstetes geschriebenes Deutsch noch ein bissler verstehbar ist.
Hey Rudi,The final result in the garage is perfect!
Please keep us updated with anything car project related.
My garage build finished a long time ago too, but everyone on my thread still enjoys my Datsun updates and seeing how big my daughter is getting LOL.
Rudi.





Haha thanks a lot. I'm pretty sure i find a lot of things to "improve" over the years. but that's the initial plan i had.finished, what madness is this????
seriously it's been it's been great to follow your progress through the whole build and you've ended up with a great place (really envious of all you've achieved)



Hey Rudi. Yeah it isIts always great receiving packages from Japan isn't it!
Rudi.


















Well yeah. i know a similar story from my previous panelbeater, that's why i switched to a new one. The old one was a one-man show who didn't have all the metal rolling tools and always would have to go to another shop to get it done. he was an expert, but very slow.Ahhh! The old body shop promise.
When you said: "The new shop I took the Datsun to has said they will have it done by Christmas" I can only say, I hope so but we will see. And then you confirmed it, pushed back a extra year possibly.
Yes yes, my body shop promised "We will start the car in 3 weeks and there is about 3 weeks worth of work on it" And then it was stuck in that shop for 2 years!
































