Building a 26*28 2 car garage with a second story. It’s framed up and slab is poured. Waiting on windows for trim and siding.
I noticed the framers put the sill plate down (brick and block foundation) but didn’t tighten down the j bolts. On some there isn’t even a nut/washer. That’s ridiculous right? I’ve asked the GC a half dozen times to make sure they take care of it and they’re just blowing me off now. Just go buy some nuts and washers and do it myself I guess?
Furthermore the framing package came with hurricane clips that they didn’t bother installing. Are they important? Should I throw them on myself too? I should note we’re not in a hurricane area and local code doesn’t require them.
I noticed the framers put the sill plate down (brick and block foundation) but didn’t tighten down the j bolts. On some there isn’t even a nut/washer. That’s ridiculous right? I’ve asked the GC a half dozen times to make sure they take care of it and they’re just blowing me off now. Just go buy some nuts and washers and do it myself I guess?
Furthermore the framing package came with hurricane clips that they didn’t bother installing. Are they important? Should I throw them on myself too? I should note we’re not in a hurricane area and local code doesn’t require them.