Started the tile installation. Using a 6x36 wood look porcelain. Spent 2 days with a grinder getting the floor as flat as was feasible and the guys started tiling yesterday. I only have one concern and that is that there is no perimeter gap to speak of and they are about 80 percent finished with laying the tile. I mean, as far as workmanship is concerned I love it but I have concerns about future tenting issues. I mentioned it to him and he is telling me it will be fine because it is on concrete. I don't have any experience with tile so I can't form an experience based opinion. My only thought was that I could grind a gap at any time so it's not a huge issue. I did, however, insist that we do a soft joint. So the questions needing addressed are:
Is a perimeter gap required, if so how much and would it be ok to just grind a gap and silicone?
How many soft joints should I have? would rather be safe than sorry and can't find any real "spec" for this. It would only be a clean line down long side of tile since they are plank style, or a jagged line could be done perpendicular to the run direction.
And is there any issue with "adding" the gap after the fact?
I got a really good price and they are working their butts off and speak almost no English so I don't want to break his stones too hard about it. But I also want it to last
Is a perimeter gap required, if so how much and would it be ok to just grind a gap and silicone?
How many soft joints should I have? would rather be safe than sorry and can't find any real "spec" for this. It would only be a clean line down long side of tile since they are plank style, or a jagged line could be done perpendicular to the run direction.
And is there any issue with "adding" the gap after the fact?
I got a really good price and they are working their butts off and speak almost no English so I don't want to break his stones too hard about it. But I also want it to last