Hi All,
I have a detached structure that I plan on feeding 2/0 aluminum (2/0-2/0-2/0-1). It's a 100A subpanel from a 200A main (single phase). This is for a small in-law apt. I calculated just under 100A load. Would like to run copper from my main till it exits my basement foundation. Have about 70 LF in the basement then another 130LF in conduit/trench then enter the detached structure and into new subpanel. From a previous post here I gather I need 2 grounding rods there.
Since I am trying to avoid running conduit in my basement, which means I need to transition to copper sheathed cable. How do I go about determine the specs/wire size for this 70 lf basement run to my main panel? Do you calculate for the full 200 lf run? I plan on getting a terminal junction box with maybe Polaris type connectors to connect the al/cu together. But don't know what type of cu cable I need. This is being done under a permit that I will be filing. Thanks!
I have a detached structure that I plan on feeding 2/0 aluminum (2/0-2/0-2/0-1). It's a 100A subpanel from a 200A main (single phase). This is for a small in-law apt. I calculated just under 100A load. Would like to run copper from my main till it exits my basement foundation. Have about 70 LF in the basement then another 130LF in conduit/trench then enter the detached structure and into new subpanel. From a previous post here I gather I need 2 grounding rods there.
Since I am trying to avoid running conduit in my basement, which means I need to transition to copper sheathed cable. How do I go about determine the specs/wire size for this 70 lf basement run to my main panel? Do you calculate for the full 200 lf run? I plan on getting a terminal junction box with maybe Polaris type connectors to connect the al/cu together. But don't know what type of cu cable I need. This is being done under a permit that I will be filing. Thanks!