So the shop will be under construction within the next 3 weeks. Looking at the entire project has given me hives so I'm trying to break it down into bite size pieces. My first piece is the pre-pour. Here's what I have so far:
- pad for shed (being moved in behind the garage)
- underground conduit from shop pad to shed pad for power
- Conduit in shop for gas, water, hydro, Ethernet
- floor drain
- insulation/pex/side pad insulation for heated floors
- perhaps a pad for the exterior man doors? (Outside)
- drain heat tracing wiring?
- grounding rods by panel location
Is there anything else I should consider or have missed?
Thanks!
- pad for shed (being moved in behind the garage)
- underground conduit from shop pad to shed pad for power
- Conduit in shop for gas, water, hydro, Ethernet
- floor drain
- insulation/pex/side pad insulation for heated floors
- perhaps a pad for the exterior man doors? (Outside)
- drain heat tracing wiring?
- grounding rods by panel location
Is there anything else I should consider or have missed?
Thanks!