Hey Guys, i have a question for a pro on concrete footers, Just had a pole barn built and when i was watching ( and i did question them) the poles are not only not centered in the building, but the hand shoveled the holes to a elongate them because the poles didnt fit in the holes they dug...
searched all over you tube for cannonball hanger, easy trak ect found nothing look up barn sliding door, nothing, then there it is haha it might give me what i want. time to go play
Pole barn door:
YouTube link to a quick video I shot of the gaps. I do have the guard over the door on the outside
I'm wondering about the rollers. Do they look correct?
hey guys, so i just had a pole barn put up and im doing my own inspection before final payment. im looking at my sliding doors, i have 2 14 hight 12 wide doors.
Im wondering about the closed gaps between building and door. the bottom is about like i would expect. maybe 1/4 inch maybe...
my shed just got done today. so things to think about
i had the same ammount of fill brought in, about 3 ft front to back of sloap on a 30x40. i ended up buying a dump truck and doing it myself, but that was my goal. i removed my old garage myself, removed walnut trees myself, ect...