First, thanks for everyone's posts on this board, made things a lot easier for an epoxy noob. I finished epoxying half my basement (about 375 SqFt) with 3 gallons of norklad 200 solids epoxy, and preprimed with Devoe 167. It was barely enough so this time I got 4.5 gallons. I used a squeegee to...