Four more braces this morning & perlins on the porch and framing will be 100%
Took the weekend off and rode a "little" bike ride for Make-A-Wish Michigan
302.5 Miles with my wife and brother in law - Such a rewarding event & great community
If you feel so inclined to support our fund raising...
Porch is sized for a few chairs and a small end table for a 🍺.
And of course to cover entry for when it’s raining.
Don’t need anything bigger than that. Patio has all the stuff you mentioned up at the house.
Bracing & truss layout done.
South side (left) is out 1/16” on length 😬. North side is 7/8”.
For my first pole building I’ll take that 😎
Tomorrow rest of my stone will be spread, 48 tons hauled yesterday.
Trusses are scheduled to be set next Wednesday 🎉
While waiting on lift parts, I spread some more recycled concrete to level the building pad.
Got it really close but ran short on material. Time to get hauling a few more loads.
1/2 day today….heading out for a week with the kids & grandkids on Saturday. Have to get the weeks normal chores done and pack.
Skirt boards, Rotbloc installed & holes topped off. Need to regrade some.
But first some 🎣 & 🍺 for a week
House does already have fiber service.
I will likely move forward with my plan as mentioned above.
Fiber & power come from two different locations. So likely 2 trenches.
Water is still being thunk on, don’t need it out there & would only be a frost free yard hydrant at corner of shop. I...