Looks great, are you going to set the rebar on dobies (blocks) or chairs (?). I used 2" chairs for 6" thickness, and wire- tied every-other junction and it became so solid a person could not move it even if they tripped.
The concrete crew will place it in the slab as it is worked.
They don't use chairs, supervised this crew when my garage was poured and trust them 100% on making it right.

5" slab here
3x3 rebar grid
4000# Mix
w/fiber
 