Thanks guys. After thinking upon, reading these responses, and looking into it a bit more, I’m going to run 2x6 across 4 joists, then bolt through that into (2 bolts into a joist, 2 bolts into just the 2x6). That will let me run perpendicular like I wanted and should hold well i believe.